Under Construction: Place of Remembrance / BARCLAY&CROUSSE Architecture

Under Construction: Place of Remembrance / BARCLAY&CROUSSE Architecture - More Images+ 22

  • Architects

  • Location

    Lima, Peru
  • Project Architects

    Sandra Barclay and Jean Pierre Crousse
  • Collaborators

    Paulo Shimabukuro, Carlos Fernandez, Sebastián Cilloniz, Rosa Aguirre, Mauricio Sialer
  • Project Area

    4896.0 m2
  • Project Year

    2014
  • Photography

  • Structures

    Ing. Raúl Ríos
  • Client

    Comisión de Alto Nivel para la Gestión e Implementación del Museo de la Memoria
  • Contractor

    ALTESA
  • Site Area

    7,573 m2
© Cristobal Palma

The Truth Commission, led by Peruvian writer Mario Vargas Llosa, launched in 2010 an open national architectural competition for the construction of a place of reconciliation between Peruvians, confronted for over twenty years in a conflict initiated by the terrorist movement Sendero Luminoso, which killed more than 70,000 people.

© Cristobal Palma

The jury of the competition, including Kenneth Frampton, Rafael Moneo, Francesco dal Co, Wiley Ludeña and José García Bryce, chose the project led by Barclay & Crousse, out of a total of 99 proposals submitted.

Named "Place of Remembrance", this center includes a theater-auditorium, a ​​research and consultation area, temporary and permanent showrooms, and related services.

© Cristobal Palma

The project, located on the cliffs that define the bay of Lima, is carefully installed on the logic of the cliffs and ravines that make them up, recovering the memory of the place in its physical configuration and its materiality.

© Cristobal Palma

The building emerges from an esplanade open to the public, the image of the pre-Columbian "canchas" or fields, enclosed by terraces that articulate the entrances to the various elements of the program. The entrance to the Place of Remembrance is from the city, through a pedestrian path that takes the visitor away from the everyday and the city to go through the gap left between the cliff and the building, recalling the natural ravines that join the Lima plateau to the ocean, at the foot of the cliff.

© Cristobal Palma

This path continues along the entire visit, through a system of ramps that end on the roof, from where visitors can take the road back to the city, in a succession of open and covered spaces that predispose the visitor to interact actively with the content of the museum.

© Cristobal Palma

The environmental responsibility is assumed by means of simple architectural devices for thermal, acoustic and visual comfort, as well as to achieve greater efficiency in the consumption of water and energy.

Plan

Project gallery

See allShow less

Project location

Address:Lima, Peru

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: Castro, Fernanda. "Under Construction: Place of Remembrance / BARCLAY&CROUSSE Architecture" [El Lugar De La Memoria / BARCLAY&CROUSSE Architecture] 29 Jan 2014. ArchDaily. (Trans. Quintana, Lorena) Accessed . <https://www.archdaily.com/470898/under-construction-place-of-remembrance-barclay-and-crousse> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.